Beam Line Diagnostics Equipment
|
Beam Line Diagnostics Equipment & Survey
|
Equipment listing
| (incl. settings)
| EDMS
|
|
Beam Position Monitors (BPM)
|
Commissioning of TBTS probe beam BPMs
| A. Palaia
| EDMS
|
Software Requirements for CTF3 TL2 and CLEX BPMs
| L. Soby
| EDMS
|
Resistive titanium coating on BPM ceramics
| W. Vollenberg
| EDMS
|
Geometric measurements of the BPM supports
| D. Pugnat
| EDMS
|
BPM calibration
| M. Johnson
| EDMS
|
Acquisition chain for CTF3 pick-ups read-out
| J. Jacquemier et al.
| LAPP-TECH-2009-01
|
CTF3 Beam Position Monitor Acquisition System
| S. Deghaye et al.
| ICALEPCS07
WPPB01
|
Limiting High Frequency Longitudinal Impedance of an Inductive Pick-up by a Thin Metallic Layer
| M. Gasior
| EPAC 2004
THPLT010
|
An Inductive Pick-Up for Beam Position and Current Measurements
| M. Gasior
| DIPAC 2003
CT01
|
Hardware of the CTF3 Beam Position Measurement System
| M. Gasior
| CTF3 Note 053
|
Head Electronics for IPU-CTF3
| M. Gasior
| EDA-00108
|
Universal Distribution Amplifier
| M. Gasior
| EDA-00088
|
CTF3 Electrostatic Head Amplifier
| J.L. Chouvet
| EDA-00019
|
CTF3 Magnetic Pick-up
| M. Gasior
| PS/BD-PU 0011
J24992, J24992
|
Calibration Current Generator
| M. Gasior
| EDMS
|
|
Video Profile Monitors (MTV)
|
Metrology report MTV (Saclay type with UU/CAI support)
| D. Pugnat
| EDMS
|
Metrology report MTV (CERN TL2 type)
| C. Bal
| EDMS
|
Optimizing reliability and identifying current limitations of the MTV system for 5 Hz CTF3 operation
| E. Bravin et al.
| PDF
|
A new Control System for the CERN TV Beams Observation
| S. Burger and E. Bravin
| CDS (2008) CERN-AB-Note-2008-041-BI
|
|
Wall Current Monitor (WCM)
|
A New Wide Band Wall Current Monitor
| P. Odier
| DIPAC 2003
PT20
|
|