Two-beam Test Stand
The two-beam acceleration scheme envisioned in CLIC will be extensively studied
in the Two-beam Test-stand (TBTS), part of the CLIC Test Facility CTF3.
A high frequency electron beam (the drive beam) is sent to a Power Extraction
Structure (PETS).
The PETS transfers the extracted beam energy into an RF structure
where it is used to accelerate the so called probe beam.
Beam stability, beam loss issues as well as PETS and RF structures will be
studied in this set-up.
|