Presentations
|
Meeting
| Date
| Author
| Title
| File
|
General
|
Visits
|
| R. Ruber
| Beyond LHC: the path towards future linear colliders
| PDF,
PPT
|
Visits
|
| R. Ruber
| Short Introduction to CLIC and CTF3
| PDF,
PPT
|
Visits
|
| A. Andersson
| Lemmings and the Miraculous Drive Beam Multiplication (6)
| MPEG
|
Visits
|
| R. Ruber
| Introduction to CERN
| PDF,
PPT
|
|
2015
|
CLIC'15
| (26-Jan-2015)
| J. Oegren
| Octupole component in CLIC accelerating structure and beam dynamics
| Indico
|
CLIC'15
| (28-Jan-2015)
| W. Farabolini
| Beam measurements at the CLEX Two-Beam Module
| Indico
|
CLIC'15
| (28-Jan-2015)
| R. Lillestol
| WF monitors measurements in TBM and TBTS
| Indico
|
2014
|
IPAC'14
| (Jun-2014)
| W. Farabolini
| Recent Results from CTF3 Two Beam Test Stand
|
|
CTF3 Exp. Verif.
| (27-May-2014)
| N. Vitoratou
| CALIFES RF calibration and gun studies
| Indico
|
CLIC'14
| (05-Feb-2014)
| W. Farabolini
| CALIFES-based beam facility, including X-band options
| Indico
|
CLIC'14
| (05-Feb-2014)
| W. Farabolini
| Status and plans for Two-Beam Test Stand and Two-Beam module in CTF3
| Indico
|
2013
|
RF Structures
| (27-Nov-2013)
| C. Borgmann
| Measurement of Transverse Coupling in the TBTS
| Indico
|
MeVArc 2013
| (5-Nov-2013)
| A. Dubrovskiy
| Studies of breakdowns at high gradients in TBTS/CTF3
| Indico
|
CTF3 Exp. Verif.
| (22-Oct-2013)
| C. Borgmann
| TBTS probe beam studies
| Indico
|
IBIC'13
| (16-Sep-2013)
| M. Olvegård
| Emittance and Momentum Diagnostics for Beams with Large Momentum Spread
|
|
HG Workshop
| (04-Jun-2013)
| W. Farabolini
| Testing with beams in CTF3: breakdown kick and advanced diagnostics
| Indico
|
HG Workshop
| (04-Jun-2013)
| W. Farabolini
| Comparison of breakdown behavior between klystron and beam driven structures
| Indico
|
RF Structures
| (29-May-2013)
| W. Farabolini
| Probe beam distortion in TBTS due to high gradient RF acceleration: Measurements and Simulations
| Indico
|
2012
|
CLIC RF Structure Development
| (21-Nov-2012)
| W. Farabolini
| TBTS Results
| Indico
|
CTF3 Working Meeting
| (11-Oct-2012)
| A. Dubrovskiy
| Flashbox Results
| Indico
|
CTF3 Working Meeting
| (11-Oct-2012)
| W. Farabolini
| TBTS Breakdown Studies
| Indico
|
CTF3 Working Meeting
| (11-Oct-2012)
| A. Palaia
| Measurements of the RF breakdown influence on the probe beam
| Indico
|
CLIC RF Structure Development
| (12-Sep-2012)
| W. Farabolini and R. Ruber
| Short Overivew of Experimental Program with TBTS
| PPT,
PDF
|
CLIC RF Structure Development
| (12-Sep-2012)
| A. Solodko
| TBTS Phase 2.3 Preparation
| Indico
|
CLIC RF Structure Development
| (12-Sep-2012)
| A. Dubrovskiy
| Flashbox Data Analysis
| Indico
|
CLIC RF Structure Development
| (16-May-2012)
| A. Dubrovskiy
| Breakdown turn-on time from TBTS and KEK data
| Indico
|
CLIC RF Structure Development
| (16-May-2012)
| W. Farabolini
| Analysis of TBTS high-gradient testing and breakdown kick
| Indico
|
CTF3 Working Meeting
| (09-Feb-2012)
| A. Dubrovskiy
| PETS On-Off Results
| Indico
|
CTF3 Working Meeting
| (09-Feb-2012)
| W. Farabolini
| TBTS Data Analysis
| Indico
|
CTF3 Working Meeting
| (09-Feb-2012)
| A. Palaia
| Measurements of the RF breakdown influence on the probe beam
| Indico
|
2011
|
CLIC RF Structure Development
| (26-Oct-2011)
| M. Jacewicz
| Status of Uppsala breakdown diagnostics
| Indico
|
CLIC RF Structure Development
| (05-Oct-2011)
| I. Syratchev, G. Riddone, A. Solodko
| On/Off News
| Indico
|
Uppsala University
| (28-Sep-2011)
| T. Ekelof
| Acceleratorutveckling för framtida forskning: ESS, CLIC och frielektronlaser
| PPT,
PDF
|
LCWS11
| (27-Sep-2011)
| A. Dubrovski
| News from TBTS
| Indico
|
LCWS11
| (27-Sep-2011)
| J. Barranco Garcia
| CALIFES status and Two Beam Acceleration Studies
| Indico
|
KVI Groningen
| (20-Sep-2011)
| R. Ruber
| CLIC Feasibility Demonstration in CTF3
| PPT,
PDF
|
IPAC11
| (05-Sep-2011)
| W. Farabolini
| Two Beam Test Stand Experiments in the CTF3 Facility
| PDF
|
Helsinki Inst. of Physics
| (10-Feb-2011)
| V. Ziemann
| A milestone on the road to CLIC
| PDF
|
CTF3 Committee
| (20-Jan-2011)
| R. Ruber
| TBTS Experimental Program and Future Evolution, Start of Discussion
| Indico
|
CTF3 Committee
| (20-Jan-2011)
| G. Riddone, I. Syratchev
| Installation Work and Other Planned Activities in TBTS
| Indico
|
CLIC RF Structure Development
| (12-Jan-2011)
| G. Riddone
| TBTS Shutdown Activities
| Indico
|
CLIC RF Structure Development
| (12-Jan-2011)
| A. Palaia
| RF-based diagnostics of discharges in high gradient accelerating structures
| Indico
|
2010
|
XB-10
| (01-Dec-2010)
| W. Farabolini
| Status of the CLIC Two-beam Test Stand
| Indico
|
IWLC2010
| (21-Oct-2010)
| A. Palaia
| Two-beam Acceleration at the TBTS
| Indico
|
IWLC2010
| (21-Oct-2010)
| W. Farabolini
| CALIFES Probe Beam Status
| Indico
|
IWLC2010
| (21-Oct-2010)
| M. Csatari
| Laser for CTF3 and Outlook for CLIC
| Indico
|
IWLC2010
| (20-Oct-2010)
| A. Dabrowski
| CTF3 Instrumentation, Opportunities and Limitations
| Indico
|
IWLC2010
| (20-Oct-2010)
| L. Soby
| CTF3 BPMs: Electronics, Radiation, Operational Challenges
| Indico
|
IWLC2010
| (20-Oct-2010)
| I Syratchev
| Report from TBTS
| Indico
|
LINAC10
| (13-Sep-2010)
| R. Ruber
| CLIC Feasibility Demonstration at CTF3
| PDF,
PPT
|
CTF3 Committee
| (19-Aug-2010)
| R. Ruber
| TBTS Status
| Indico
|
Summer Student Poster Session
| (12-Aug-2010)
| L. Wallenhorst
| Two-beam acceleration in the CLIC Test Facility
| PDF
|
CTF3 Collaboration Meeting
| (06-May-2010)
| W. Farabolini
| CALIFES status
| Indico
|
Breakdown Physics Workshop
| (06-May-2010)
| V. Ziemann
| In-situ breakdowns in SEM
| Indico
|
CTF3 Collaboration Meeting
| (05-May-2010)
| A. Cappelletti
| Results of beam based RF power production in CTF3
| Indico
|
4th X-band Structure Meeting
| (05-May-2010)
| R. Ruber
| TBTS - beams, structures and schedules
| Indico
|
CTF3 Committee
| (11-Feb-2010)
| R. Ruber
| TBTS Status
| Indico
|
2009
|
CLIC09 Workshop
| (15-Oct-2009)
| R. Ruber
| 12GHz PETS Testing in the Two-beam Test Stand
| Indico
|
CLIC09 Workshop
| (13-Oct-2009)
| R. Ruber
| First 12GHz PETS Operation in the Two-beam Test Stand
| Indico
|
CLIC Experimental and Breakdown Studies
| (29-Sep-2009)
| C. Hellenthal
| PETS Conditioning and Breakdown Analysis
| Indico
|
CTF3 Committee
| (17-Sep-2009)
| I. Syratchev
| PETS Processing History
| Indico
|
CLIC RF Structure Development
| (16-Jul-2009)
| C. Hellenthal
| PETS Analysis 11-Dec-2008/03-Jul-2009
| Indico
|
CLIC RF Structure Development
| (25-Mar-2009)
| V. Ziemann
| PETS Recirculation Analysis
| Indico
|
CLIC Meeting
| (20-Feb-2009)
| I. Syratchev
| Status and R&D progrma of the CLIC Power Extraction and Transfer Structure (PETS)
| Indico
|
CTF3 Collaboration Meeting
| (28-Jan-2009)
| R. Ruber
| TBTS Commissioning and First Results
| Indico
|
CTF3 Collaboration Meeting
| (28-Jan-2009)
| E. Adli
| 12GHz PETS Conditioning with Recirculation
| Indico
|
2008
|
MIAMI2008
| (16-Dec-2008)
| T. Ekelöf
| The 3TeV Compact Linear Collider CLIC
| PPT
|
CTF3 Committee
| (11-Dec-2008)
| R. Ruber, I. Syratchev
| TBTS Status
| Indico
|
XB-08
| (02-Dec-2008)
| R. Ruber
| First Results of the Two-beam Test Stand
| Indico
|
CTF3 Committee
| (20-Nov-2008)
| I. Syratchev
| TBTS Status
| Indico
|
Structures WG
| (19-Nov-2008)
| E. Adli, I. Syratchev
| First Results from PETS in the TBTS
| Indico
|
Partikeldagarna
| (16-Oct-2008)
| V. Ziemann
| CLIC
| PDF
|
CLIC08 Workshop
| (16-Oct-2008)
| R. Ruber, I. Syratchev
| TBTS Status
| Indico
|
Uppsala University
| (25-Sep-2008)
| R. Ruber
| The Energy Frontier: Multi-TeV Collider R&D in the Two-beam Test Stand
| PDF,
PPT
|
CTF3 Committee
| (18-Sep-2008)
| V. Ziemann
| Two-beam Test-stand Status
| PDF
|
EPAC'08
| (25-Jun-2008)
| R. Ruber
| The CTF3 Two-beam Test-stand Installation and Experimental Program
| PDF
|
EPAC'08
| (25-Jun-2008)
| M. Johnson
| RF-breakdown Experiments at the CTF3 Two-beam Test-stand
| PDF
|
CLIC Breakdown Workshop
| (20-May-2008)
| M. Johnson
| Ion Current from Breakdowns in RF Structures
| PDF
|
CLIC Structure Working Group
| (29-Apr-2008)
| R. Ruber
| TBTS Organization and Planning
| Indico
|
CTF3 Committee
| (18-Apr-2008)
| R. Ruber
| TBTS Status and Plans
| PDF,
PPT
|
Visit Dean U.U.
| (07-Feb-2008)
| R. Ruber (ed.)
| Uppsala University at CERN
| PDF
|
CTF3
| (23-Jan-2008)
| V. Ziemann
| Experiments in the Two-beam Test-stand
| PDF
|
CTF3
| (23-Jan-2008)
| R. Ruber
| The Two-beam Test-stand: The Next Generation of Tests
| PDF,
PPT
|
ACE
| (17-Jan-2008)
| R. Ruber
| The Next Generation of Tests: The Two-beam Test-stand
| PDF,
PPT
|
|
2007
|
CLIC07 Workshop
| (17-Oct-2007)
| M. Johnson
| Mid-linac and Two-beam Test-stand Testing Plans
| PPT
|
CLIC07 Workshop
| (17-Oct-2007)
| V. Ziemann
| R&D Plans for DC Breakdown Measurements Inside a Scanning Electron Microscope
| PDF
|
Uppsala University
| (28-Sep-2007)
| R. Ruber
| Novel Accelerator and Detector Systems
| PDF,
PPT
|
TIC
| (19-Sep-2007)
| R. Ruber
| Two-beam Test-stand - Design and Construction Status
| PDF,
PPT
|
CLIC
| (24-Aug-2007)
| M. Johnson
| Positive Ion Current - Hot Coulomb Explosion?
| PDF,
PPT
|
CTF3
| (17-Jan-2007)
| R. Ruber
| Two Beam Test Stand - Uppsala
| PPT
|
CTF3
| (17-Jan-2007)
| H. Braun
| CLEX status,plans
| PPT,
PDF
|
|
2006
|
Partikeldagarna
| (19-Oct-2006)
| M. Johnson
| The Detection of RF Breakdown in the CLIC Accelerating Cavities
| PDF
|
HG 2006
| (27-Sep-2006)
| M. Johnson
| The Two-beam Test-stand in CTF3
| PDF
|
CTF3
| (12-Jul-2006)
| V. Ziemann
| Two-beam Test-stand in CTF3, Status and Schedule
| PDF
|
CTF3
| (15-Feb-2006)
| V. Ziemann
| Two-beam Test-stand in CTF3
| PDF
|
|
2005
|
CTF3
| (29-Nov-2005)
| V. Ziemann
| Two-beam Test-stand and other Uppsala Activities
| PDF
|
CTF3
| (29-Nov-2005)
| H. Braun
| CLEX status, plans
| PDF
|
|
2004
|
CTF3
| (24-Nov-2004)
| V. Ziemann
| Two-Beam Test Stand and TL2 Beamline
| PDF
|
CTF3
| (24-Nov-2004)
| H. Braun
| CLEX layout and general remarks
| PDF
|
|